# Power from lava in geothermial generators
|
|
|
|
## Production
|
|
|
|
1 Geothermal Generator produces 20EU/t with lava and consumes 1 bucket of lava in 50s at max capacity. 32 Generators produce 640EU/t and 64 produce 1280EU/t.
|
|
|
|
## Cost
|
|
|
|
1 Geothermal Generator needs:
|
|
- 10 refined iron
|
|
- 6 tin
|
|
- 4 glass
|
|
- 2 redstone
|
|
- 1/2 copper
|
|
- 1 rubber
|
|
|
|
32 need:
|
|
- 5 stacks of iron (320)
|
|
- 3 stacks of tin (192)
|
|
- 2 stacks of glass (128)
|
|
- 1 stack of redstone (64)
|
|
- 18 copper -> 36x cable
|
|
- 36 rubber -> 36x cable
|
|
|
|
64 need:
|
|
- 10 stacks of iron (640)
|
|
- 6 stacks of tin (384)
|
|
- 4 stacks of glass (256)
|
|
- 2 stacks of redstone (128)
|
|
- 33 copper -> 66x cable
|
|
- 66 rubber -> 66x cable
|