1.1 KiB
1.1 KiB
Lava centrifuging to Copper and Tin
Production
One centrifuge converts 16 Lava buckets to 4 Copper Ingots, 2 Tin Ingots, 1 Electrum Ingot and 2 tiny piles of Tungsten in 500 seconds, using 5EU/t.
Item | 1 centrifuge | 64 | 128 | 192 | 256 | 6 stacks | 8 stacks | 10 stacks |
---|---|---|---|---|---|---|---|---|
Lava per Minute | 1.92 | 123 | 246 | 369 | 492 | 737 | 983 | 1229 |
Copper per Minute | 0.48 | 31 | 61 | 92 | 123 | 184 | 246 | 307 |
Tin per Minute | 0.24 | 15 | 31 | 46 | 61 | 92 | 123 | 154 |
Electrum per Minute | 0.12 | 7.7 | 15 | 23 | 31 | 46 | 61 | 77 |
EU/t | 5 | 320 | 640 | 960 | 1280 | 1920 | 2560 | 3200 |
Roughly one pair of boilers needed per stack of centrifuges, or 16 Geothermal Generators.
Centrifuge cost
Item | For 1 Centrifuge | For 1 Stack | For 3 Stacks |
---|---|---|---|
refined iron | 31 | 1984 | 5952 |
redstone | 14 | 896 | 2688 |
copper | 9 | 576 | 1728 |
rubber | 18 | 1152 | 3456 |
glowstone | 4 | 256 | 768 |
lapis | 4 | 256 | 768 |
advanced alloys | 4 | 256 | 768 |
coal dust (for carbon plates) | 32 | 2048 | 6144 |
planks | 20 | 1280 | 3840 |