32 lines
732 B
Markdown
32 lines
732 B
Markdown
|
# Ore processing
|
||
|
|
||
|
## Centrifuge
|
||
|
- Industrial Centrifuge Multiblock
|
||
|
- Size: 3x3x3
|
||
|
- Requires Inconel-792 (TPV coils, 1 stack) and Maraging Steel (EV mixer, 1.5 stacks)
|
||
|
|
||
|
## Thermal Centrifuge
|
||
|
- Large Thermal Refinery
|
||
|
- Size: 3x2x3
|
||
|
- Requires Talonite (TPV coils, small amounts) and red steel (~72) + black steel (~24)
|
||
|
|
||
|
## Ore Washer
|
||
|
- Ore Washing Plant
|
||
|
- Size: 5x3x7
|
||
|
- Requires Grisium (TPV coils, 6-7 stacks) and Talonite (~2.5 stacks)
|
||
|
- Currently 1 for water/distilled water
|
||
|
- Future:
|
||
|
- 1 for sodium persulfate
|
||
|
- 1 for sulfuric acid
|
||
|
- 1 for mercury
|
||
|
|
||
|
## Macerator
|
||
|
- Industrial Maceration Stack
|
||
|
- Size: 3x6x3
|
||
|
- Requires lots of titanium (~350)
|
||
|
|
||
|
## Sifter
|
||
|
- Large Sifter
|
||
|
- Size: 5x3x5
|
||
|
- Requires lots of eglin and tumbaga
|