Fix file links in README

This commit is contained in:
Anton Reinhard 2024-05-18 19:01:55 +02:00
parent da57201c78
commit b9dc5a5d35

View File

@ -217,7 +217,7 @@ In 3x3 Chunk Area:
### Lava centrifuges
At some point, start building centrifuges for lava producing copper and tin! Start with 32 or 64, then expand later.
For more details [see here](./material_calculations/lava_calcs.md).
For more details [see here](./calculations/lava_calcs.md).
### Frame Quarry
- 144 Support Frames (+32-64 later)
@ -296,19 +296,19 @@ Keep enough for Assemblers making Data Control Circuits etc.
- 1 stack of centrifuges for platinum dust
- Keep ~300 platinum for circuit boards for the fusion
More details [here](./material%20calculations/iridium_calcs.md)
More details [here](./calculations/iridium_calcs.md)
### For Chrome (need 526)
- 4 IBFs for chrome dust -> chrome ingots
- 4 electrolyzers on ruby dust -> chrome dust
- 3 stacks centrifuges for redstone -> ruby dust
More details [here](./material%20calculations/chrome_calcs.md)
More details [here](./calculations/chrome_calcs.md)
### For Titanium (need 280)
- 16 electrolyzers on bauxite dust
More details [here](./material%20calculations/titanium_calcs.md)
More details [here](./calculations/titanium_calcs.md)
### For Beryllium (need 264)
- 4 electrolyzers on ender pearl dust
@ -377,4 +377,3 @@ Total of 57 Superconductors required (15 recipes of 4):
## Charging the Reactor:
- Assuming full throughput, the 4 Energy Injectors can accept 32768EU/t, taking about 1 minute to fully charge the required 40 million EU.
- This would require 64 boiler pairs (4 layers) with at least partially charged MFSUs, or 85 boiler pairs without any buffer dedicated to the charging.